Ultra high voltage AC lines
Released:2021-08-10

The 1000kV Jindongnan Nanyang Jingmen ultra-high voltage transmission line is China's first experimental demonstration project. It was completed and put into commercial use on January 6, 2009, with a total length of 640 kilometers. It is the world's highest voltage level, largest transmission capacity, and most advanced ultra-high voltage AC transmission and transformation project, known as China's "power expressway". This line is an important channel for north-south mutual supply and water and fire regulation, which is of great significance for environmental protection. Firstly, the coal from the north does not need to be transported south, and on-site power generation is achieved through electricity transmission; Secondly, one ultra-high voltage line has to withstand five 500kV lines, greatly saving land resources.

In September 2018, our company's distributed fault diagnosis system for transmission lines was applied to the 1000kV Nanjing I line. The system can quickly determine the fault zone, clarify operation and maintenance responsibilities, accurately locate the fault point, assist in guiding rapid emergency repairs, effectively shorten the power outage time due to line faults, reduce the loss of transmission capacity caused by power outages, and provide reliable guarantees for the rapid recovery of power supply after line faults.

 

image.png

image.png

 

The Inner Mongolia Shandong 1000kV ultra-high voltage AC transmission line starts from Xilingol League in Inner Mongolia, passes through four provinces and cities of Inner Mongolia, Hubei, Hebei, Tianjin, and Shandong, and ends in Jinan, Shandong. The entire line adopts the same tower double circuit installation, with a total length of more than 730 kilometers for the two circuits. It is a cross provincial transmission line. The Xilang Line project has been put into operation, delivering 2 million kilowatts of clean electricity from Shandong to Inner Mongolia, and increasing Shandong's capacity to accept external electricity from the province to 10 million kilowatts. At the same time, the production of the project has greatly alleviated the tense situation of summer power supply in Shandong Province, providing reliable guarantees for the stable operation of the power grid during summer.

In June 2016, our company's distributed fault diagnosis system for transmission lines was applied to 1000kV Xilang Line I and II. The system can quickly and accurately locate the fault point and analyze the cause of the fault, effectively improving the operation and maintenance level of transmission lines.

 

image.png

 


 

Partial application lines:

Ø 1000kV Nanjing I Line

Ø  1000kV Hequan I Line

Ø 1000kV Tin Gallery I and II lines

Ø 1000kV Huaixu I and II lines

Ø  1000kV Xutai I and II lines

Ø 1000kV Antang I and II lines

Ø 1000kV Wutang I and II lines

Ø 1000kV Ehong I and II lines

Ø 1000kV Yigao I and II lines

Ø 1000kV Du Rong I and II lines

 

 

previous articleno more

next articleUltra high voltage DC lines

Official Phone Business Phone O&M phone 0086-027-87420702 0086-13277695881 400-027-0051

Address:Weilai zhi guang Industry Park,No. 3 Guanggu Boulevard, East Lake High-tech Development Zone,Wuhan City, Hubei Province,China.

COPYRIGHT ?2016Wuhan Sunshine Power Technology Co., LTD. All Rights Reserved

Technical Support:Youhoo

通渭县| 旬邑县| 德钦县| 武胜县| 南丰县| 余庆县| 福安市| 黄梅县| 澜沧| 申扎县| 新野县| 泌阳县| 墨玉县| 康乐县| 汉沽区| 澄迈县| 承德县| 金川县| 宜丰县| 吉林省| 鹿邑县| 平利县| 启东市| 玛纳斯县| 仙桃市| 溧阳市| 余庆县| 沾化县| 三明市| 寿宁县| 沁阳市| 军事| 新宁县| 杭锦旗| 长武县| 特克斯县| 宁津县| 德保县| 嫩江县| 长春市| 丹棱县|